Analysis of Prioritization of Road Development in Regional Development in North Labuhanbatu Regency

Ester Maria Barus, Dwi Lindarto, Nurdin Sulistiyono

Abstract


The purpose of this study is to find out how effective location / area conditions are a top priority for the determination of road construction in North Labuhanbatu Regency. The interview data showed that 3 (three) criteria taken in this study, using the Analytical Hierarchy Process (AHP) method were obtained, namely, the cost of development (33.7%), road conditions (46.9%) is the most dominant criterion and level of importance (19.4%). By including 3 (three) criteria against 15 (fifteen) proposals, the evaluation of the comparison of road development priorities of North Labuhanbatu Regency in Fiscal Year 2019 with the priority of alternative road development in regional development obtained 2 (two) road activities that became priorities for Alternative Road Development, namely Hardening Jl Pasar Barat Towards Block I Lingk. West Market Kel. Tanjung Leidong Kec. Kualuh Leidong and Jl Bawal Lingk Development. Kp Baru 4 Kel. Tanjung Leidong Kec. Kualuh Leidong.


Keywords


prioritization, road construction, analytic hierarchy process (AHP), North Labuhanbatu Regency

Full Text:

PDF

References


Anggara, S. (2014). Public policy. Bandung: Setia Library Bandung.

Abidin, S. Z. (2004). Public Policy (2 ed.). Jakarta: Pancur Siwah Foundation.

Harun, H. (2004/2005). Feasibility Analysis of Regional Development Projects. Yogyakarta: Faculty of Economics UGM Yogyakarta.

Law No. 25 of 2004 concerning the national development planning system

North Labuhanbatu, P. K. (2015). Spatial and Regional Plans for 2015-2035. Aek Kanopan: North Labuhanbatu.

North Labuhanbatu, P. (2017). Strategic Plan (SKPD) of the Department of Housing and Settlements of North Labuhanbatu Regency 2017-2021. Aek Kanopan.

Nasution, M. A. (2008). Regional Development Planning. Medan: Fisip USU Press.

Rustiadi, E., Saefulhakim, S., & Panuju, D. R. (2011). Regional Planning and Development. Jakarta: Crestpent Press and the Indonesian Obor Library Foundation.

Susila, W. R., & Munadi, E. (2007). Use of Analytical Hierarchy Process for Prioritizing Research Proposals. Agricultural Informatics, 16(2).

Saaty, T. L. (1993). Decision Making for Leaders, Analytical Hierarchical Process for Decision Making in Complex Situations. Jakarta: PT. Library of Binaman Pressindo.

Sembiring, I. S. (2008). Priority Determination Study for Road Improvement (Case Study: Provincial Road Section in Samosir Regency). Field: Thesis.

Shah, M. et al. (2020). The Development Impact of PT. Medco E & P Malaka on Economic Aspects in East Aceh Regency. Budapest International Research and Critics Institute- Journal (BIRCI-Journal). P. 276-286

Susila, W. R., & Munadi, E. (2007). Use of Analytical Hierarchy Process for Prioritizing Research Proposals. Agricultural Informatics, 16(2).




DOI: https://doi.org/10.33258/birci.v4i4.2961

Article Metrics

Abstract view : 30 times
PDF - 33 times

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

 

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.