Analysis of Adaptive Scheduling Production Planning in Palembang’s Jumputan Industry

Shabila Fitri Aulia, Muhammad Izman Herdiansyah

Abstract


Destination Palembang has some cultural heritages, one of that is the jumputan fabric. One of the jumputan fabric production places in Palembang is the Griya Tuan Kentang Industry. However, in the process, the production of jumputan fabric still uses a manual process including scheduling the production process.  This study aims to analyze the management of jumputan production scheduling in the Griya Tuan Kentang Industry.  The population of this study was 20 craftsmen but the researcher only conducted interviews with 1 craftsman as the owner of Juanda jumputan.  This research was conducted using qualitative descriptive analysis methods. Data analysis techniques using descriptive qualitative are one type of research whose research result research is not obtained through statistical procedures or other quantification methods.  The results of this study were carried out by trying the number of orders based on sales history in April 2022Based on sales history in April 2022, there are 6 orders for 735 sheets with a size of 3 x 1.5 m with a total number of workers of 143 persons who have their respective duties and responsibilities per stage so that all orders can be completed within 87 days.


Keywords


scheduling; EDF; jumputan

Full Text:

PDF

References


“Perancangan Sistem Informasi Penjadwalan Produksi Pada Toko Perabot.” Jurnal Sains dan Informatika 8, no. 1 (April 30, 2022). https://doi.org/10.22216/jsi.v8i1.977.

Adiwijaya, Fakhrian Fadlia, and Ana Hadiana. (2018). “Realtime Business Intelligence Menggunakan Algoritma Apriori dengan Data Stream Mining (Studi Kasus: Penjadwalan PT. Citra Tiara Global).” Jurnal Tata Kelola dan Kerangka Kerja Teknologi Informasi 4, no. 2 (September 1,): 62–67. https://doi.org/10.34010/jtk3ti.v4i2.1987.“BukuRTOSFinal.Pdf,” n.d.

Arif, S. (2019). Influence of Leadership, Organizational Culture, Work Motivation, and Job Satisfaction of Performance Principles of Senior High School in Medan City. Budapest International Research and Critics Institute-Journal (BIRCI-Journal). P. 239-254

Faris, Moh. Fahrul, and Wiwik Handayani. “Analisis Penjadwalan Produksi Berdasarkan Pesanan Menggunakan Metode Asas Prioritas pada CV Davero Cemerlang Indonesia Surabaya.” Al-Kharaj : Jurnal Ekonomi, Keuangan & Bisnis Syariah 4, no. 2 (November 18, 2021): 380–96. https://doi.org/10.47467/alkharaj.v4i2.676.

Herdiansyah, Muhammad Izman, Hasmawati, Dedi Syamsuar, and Ahmad Fauzi Ismail. “Mixed Integer Linear Programming Model for Optimizing Batik Palembang Supply Chain Network.” Advanced Science Letters 24, no. 11 (November 1, 2018): 8422–26. https://doi.org/10.1166/asl.2018.12579.

Lelitasari, Anis, Muhammad Izman Herdiansyah, Ahmad Haidar Mirza, Darius Antoni, and Dedy Syamsuar. (2019). “Jumputan Wastewater Optimization Model Using Green Logistic Network Approach.” In 2019 International Conference on Electrical Engineering and Computer Science (ICECOS), 321–25. Batam Island, Indonesia: IEEE, https://doi.org/10.1109/ICECOS47637.2019.8984536.

Manday, Dhanny Rukmana, and Achmad Imam Kistijantoro. “ANALISIS SISTEM PENJADWALAN REAL-TIME MULTICORE PADA VIRTUALISASI RT-XEN 2.0” 6 (2019): 5.

Niati, D. R., Siregar, Z. M. E., & Prayoga, Y. (2021). The Effect of Training on Work Performance and Career Development: The Role of Motivation as Intervening Variable. Budapest International Research and Critics Institute (BIRCI-Journal): Humanities and Social Sciences, 4(2), 2385–2393. https://doi.org/10.33258/birci.v4i2.1940

Pengantar, Kata, and Dr Conny R Semiawan. “JENIS, KARAKTERISTIK, DAN KEUNGGULANNYA,” n.d., 171.

Pratama, Aldo Buyung, and Yustina Ngatilah. “ANALISA PENJADWALAN PRODUKSI DENGAN MENGGUNAKAN METODE CAMPBELL DUDEK SMITH DI PT. ELANG JAGAD.” JUMINTEN 2, no. 4 (July 12, 2021): 25–36. https://doi.org/10.33005/juminten.v2i4.286.

Setiawan, Albi Anggito, Johan. (2018). Metodologi penelitian kualitatif. CV Jejak (Jejak Publisher),.

Zakiah, Iftitakhul. “Algoritma Greedy pada Penjadwalan Real-Time untuk Earliest Deadline First Scheduling dan Rate Monotonic Scheduling serta Perbandingannya,” n.d., 6.




DOI: https://doi.org/10.33258/birci.v5i3.6630

Article Metrics

Abstract view : 26 times
PDF - 11 times

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

 

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.