Success Factors for Lean Six Sigma Implementation and Time Cost Trade off in High Rise Office Buildings to Improve Cost and Time Performance
Abstract
A high-rise office building is a physical form of construction work that is integrated with its seat, partly or completely located above and/or in the ground and/or that is sailed as a place for humans to carry out their activities. This research was carried out with the aim of determining Cost and Time Performance in high-rise office buildings with the Implementation of Lean Six Sigma and time cost trade off. In project execution, scheduling and good quality play an important role in the timeliness, cost, and quality of project completion. Project delays often occur in the process of implementing construction projects. The quality is not good because it does not match the technical specifications. In the end there is a loss on a project. The results of the analysis study used "Structural Equation Modeling" (SEM). In the High-Rise Building project, 10 influential indicators were obtained where the indicators were: Implementation, Design Improvements, Delay, Planning, Define, Analyze, Improvel, Measure, Tender Documents, Process.
Keywords
Full Text:
PDFReferences
Abu Bakr, F. A, Subari, K., & Mohd Daril, M. A. (2015). Critical success factors of Lean Six Sigma deployment: a current review. Int. J. Lean Six Sigma, vol. 6, no. 4, pp. 339–348, doi: 10.1108/IJLSS-04-2015-0011.
Akhund, M. A., Imad, H. U., Memon, N. A., Siddiqui, F., Khoso, A. R., & Panhwar, A. A. (2018). Contributing Factors of Time Overrun in Public Sector Construction Projects. Engineering, Technology & Applied Science Research, 8(5), 3369–3372. https://doi.org/10.48084/etasr.2276
Alhuraish, I., Robledo, C., & Kobi, A. (2017). A comparative exploration of lean manufacturing and six sigma in terms of their critical success factors. In Journal of Cleaner Production (Vol. 164). Elsevier B.V. https://doi.org/10.1016/j.jclepro.2017.06.146
Ali, A., Amin, M, & Husin, A. E. (2019). Key success factors for safety programs implementation in Indonesian construction projects. Int. J. Civ. Eng. Technol, vol. 10, no. 2, pp. 1385–1394, doi: 10.13140/RG.2.2.36301.49127.
Arumsari, P., & Tanachi, R. (2018). Value engineering application in a high-rise building (a case study in Bali). IOP Conference Series: Earth and Environmental Science, 195(1). https://doi.org/10.1088/1755-1315/195/1/012015
Averaging, M. (2021). Quantifying Critical Success Factors (CSFs) in Management of Investment-Construction Projects: Insights from Bayesian.
Basto, M, & Pereira, J. M. (2012). An SPSS R-menu for ordinal factor analysis. J. Stat. Softw, vol. 46, no. 4, doi: 10.18637/jss.v046.i04.
De M. Nascimento, D. L, Goncalvez Quelhas, O. L, Gusmão Caiado, R. G., Tortorella, G. L, Garza-Reyes, J. A, & Rocha-Lona, L. (2020). Lean six sigma frameworks for continuous and incremental improvement in the oil and gas sector. Int. J. Lean Six Sigma, v. ol. 11, no. 3, pp. 577–595, doi: 10.1108/IJLSS-02-2019-0011.
Deceased, F. S. M., & Ricketts, J. T. (1995). Building design and construction handbook. In Choice Reviews Online (Vol. 32, Issue 05). https://doi.org/10.5860/choice.32-2755
Ekambaram, A., SØrensen, A., Bull-Berg, H., & Olsson, N. O. E. (2018). The role of big data and knowledge management in improving projects and project-based organizations. Procedia Computer Science, 138, 851–858. https://doi.org/10.1016/j.procs.2018.10.111
Emanuel, R. E., & Wilkins, D. E. (2020). Breaching barriers: The fight for indigenous participation in water governance. Water (Switzerland), 12(8), 1–37. https://doi.org/10.3390/W12082113
Ervianto, I. W. (2002). Theory - Applications of Construction Project Management. Yogyakarta: andi offset. 272.
Gaspersz, J. (2011). Compete with creativity. SSRN Electron. J, doi: 10.2139/ssrn.983934.
Grytting, I., Svalestuen, F., Lohne, J., Sommerseth, H., Augdal, S., & Lædre, O. (2017). Use of LoD Decision Plan in BIM-projects. Procedia Engineering, 196(June), 407–414. https://doi.org/10.1016/j.proeng.2017.07.217
Hair, J. F., Risher, J. J., Sarstedt, M., & Ringle, C. M. (2019). When to use and how to report the results of PLS-SEM. European Business Review, 31(1), 2–24. https://doi.org/10.1108/EBR-11-2018-0203
Husin, A. E, & Sustiawan, F. (2021). RII (Relative Important Index) analysis of influential factors in implementing BIM 4D and M-PERT in the work of high-rise residential building structures. J. Apps. Tech. Civil, vol. 19, no. 4, p. 417, doi: 10.12962/j2579-891x.v19i4.9336.
Husin, A. E., & Kussumardianadewi, B. D. (2018). Cost performance review on value engineering optimized floor cover finishing work of high-rise office building. International Journal of Engineering and Advanced Technology, 8(2), 146–154. https://doi.org/10.13140/RG.2.2.29165.33764
Husin, A. E., & Kussumardianadewi, B. D. (2018). Cost performance review on value engineering optimized floor cover finishing work of high-rise office building. International Journal of Engineering and Advanced Technology, 8(2), 146–154. https://doi.org/10.13140/RG.2.2.29165.33764
Husin, A. E., & Kussumardianadewi, B. D. (2018). Cost performance review on value engineering optimized floor cover finishing work of high-rise office building. International Journal of Engineering and Advanced Technology, 8(2), 146–154. https://doi.org/10.13140/RG.2.2.29165.33764
Husin, A. E., & Kussumardianadewi, B. D. (2018). Cost performance review on value engineering optimized floor cover finishing work of high-rise office building. International Journal of Engineering and Advanced Technology, 8(2), 146–154. https://doi.org/10.13140/RG.2.2.29165.33764
Husin, A. E., & Kussumardianadewi, B. D. (2018). Cost performance review on value engineering optimized floor cover finishing work of high-rise office building. International Journal of Engineering and Advanced Technology, 8(2), 146–154. https://doi.org/10.13140/RG.2.2.29165.33764
Husin, A. E., Setyawan, T. L, Meidiyanto, H, Kussumardianadewi, B. D, & Eddy Husin, M. K. (2019). Key success factors implementing BIM based quantity take-off in fit-out office work using relative importance index. Int. J. Eng. Adv. Technol, vol. 8, no. 6, pp. 986–990, doi: 10.35940/ijeat. F82650.88619.
Izzah, N. (2017). Time and Cost Exchange Analysis Using the Time Cost Trade Off (TCTO) Method on The Development Project Time Exchange Analysis and Cost Using Time Cost Trade Off (TCTO) Method in Housing Development Projects in PT. X. Industrial Engineering, 10(1), 51–58.
Jeyaraman, K. - Teo, L. K. (2010). Conceptual framework for lean six Sigma critical success factors: Implementation on the performance of the electronic manufacturing services industry. Int. J. Lean Six Sigma, vol. 1, no. 3, pp. 191–215, doi: 10.1108/20401461011075008.
Joe, J., Choi, W., Kwak, Y., & Huh, J. H. (2014). Optimal design of a multi-story double skin facade. Energy and Buildings, 76, 143–150. https://doi.org/10.1016/j.enbuild.2014.03.002
Joe, J., Choi, W., Kwak, Y., & Huh, J. H. (2014). Optimal design of a multi-story double skin facade. Energy and Buildings, 76, 143–150. https://doi.org/10.1016/j.enbuild.2014.03.002
Kingdom, U. (2020). RIDERS.
Kulsum, K., Rahman, R. F, & Febianti, E. (2021). Identification and proposed strategy for minimizing defects using the lean six sigma method in the pallet production process. Tek. J. Sains dan Teknol, vol. 17, no. 1, p. 89, doi: 10.36055/tjst. v17i1.10942.
Liu, L., Ding, Q., Zhong, Y., Zou, J., Wu, J., Chiu, Y. L., Li, J., Zhang, Z., Yu, Q., & Shen, Z. (2018). Dislocation network in additive manufactured steel breaks strength–ductility trade-off. Materials Today, 21(4), 354–361. https://doi.org/10.1016/j.mattod.2017.11.004
Marianus, Y., & Kiwan, T. (2019). SAAT TENDER PROYEK KONSTRUKSI DI KABUPATEN. 2, 31–39. [26] Manzoor, B., Othman, I., & Kang, J. M. (2021). applied sciences Influence of Building Information Modeling (BIM) Implementation in High-Rise Buildings towards Sustainability.
Munje, A. S., & Patil, D. S. (2014). Comparative study of last planner system over traditional construction processes. Current Tren. Tech. Sci, 3, 308–311.
Nguyen, P. T., Pham, C. P., Phan, P. T., Vu, N. B., Tien, M., & Duong, H. (2021). Exploring Critical Risk Factors of Office Building Projects *. 8(2), 309–315. https://doi.org/10.13106/jafeb.2021.vol8.no2.0309 [20] Zainal, R., Al-Tawil, Y. M., Kasim, N., Meryam, S., Musa, S., Noh, H. M., & Mohammed, M. (2019). Success Factor for Project Management on High Rise Building Project. Journal of Technology Management and Business, 6(3), 50–059.
Nguyen, P. T., Pham, C. P., Phan, P. T., Vu, N. B., Tien, M., & Duong, H. (2021). Exploring Critical Risk Factors of Office Building Projects *. 8(2), 309–315. https://doi.org/10.13106/jafeb.2021.vol8.no2.0309 [20] Zainal, R., Al-Tawil, Y. M., Kasim, N., Meryam, S., Musa, S., Noh, H. M., & Mohammed, M. (2019). Success Factor for Project Management on High Rise Building Project. Journal of Technology Management and Business, 6(3), 50–059.
Noor, R. M., Musir, A., & Nasir, M. (2017). Critical success factors for construction project Critical Success Factors for Construction Project. 030011(October 2016). https://doi.org/10.1063/1.4965067
Oxford Economics/Haver Analytics, 2021
Ozorhon, B., & Cinar, E. (2015). Critical success factors of the implementation of enterprise resource planning in construction: The Turkish case. J. Managing Eng, vol. 31, no. 6, p. 04015014, doi: 10.1061/(asce)me.1943-5479.0000370.
Ozorhon, B., & Cinar, E. (2015). Critical success factors of the implementation of enterprise resource planning in construction: The Turkish case. J. Managing Eng, vol. 31, no. 6, p. 04015014, doi: 10.1061/(asce)me.1943-5479.0000370.
Pande, P. S., Neuman, R. P., Cavanagh, R. R., & George, M. L. (2002). The Six Sigma way team fieldbook: An implementation guide for process improvement teams. McGraw-Hill New York, NY
Pinch, L. (2005). Lean construction. Construction Executive, 15(11), 8–11.
Podinovski, V. (2002). W Arwick B Usiness S Chool. 401
Qu, J., Wang, Z., & Du, P. (2021). Comparative Study on the Development Trends of High-rise Buildings Above 200 Meters in China, the USA and the UAE. 10(1), 63–71.
Samarghandi, H. (2019). Minimizing the makespan in a flow shop environment under minimum and maximum time-lag constraints. Computers and Industrial Engineering, 136(August), 614–634. https://doi.org/10.1016/j.cie.2019.07.048
Samarghandi, H. (2019). Solving the no-wait job shop scheduling problem with due date constraints: A problem transformation approach. Computers and Industrial Engineering, 136(November 2018), 635–662. https://doi.org/10.1016/j.cie.2019.07.054
Schön, K., Bergquist, B., & Klefsjö, B. (2010). A study on how to improve the throughput time of Lean Six Sigma projects in a construction company. International Journal of Lean Six Sigma, 5(2), 212–226.
Sekar, G., Sambasivan, M., & Viswanathan, K. (2020). Does size of construction firms matter? Impact of project-factors and organization-factors on project performance. Built Environment Project and Asset Management, 11(2), 174–194. https://doi.org/10.1108/BEPAM-07-2020-0118
Shah, M. et al. (2020). The Development Impact of PT. Medco E & P Malaka on Economic Aspects in East Aceh Regency. Budapest International Research and Critics Institute-Journal (BIRCI-Journal). P. 276-286.
Shirkah. (2020). 5(3)
Sobieraj, J., & Metelski, D. (2021). Quantifying critical success factors (Csfs) in management of investment-construction projects: Insights from bayesian model averaging. Buildings, 11(8). https://doi.org/10.3390/buildings11080360 [16] Brigadier General, J., No. S., Civil, J. T., Engineering, F., Diponegoro, U., Soedarto, J. P., Civil, J. T., Engineering, F., Diponegoro, U., & Soedarto, J. P. (n.d.). Evaluation of the Application of Constructability in Building Construction Projects.
Sobieraj, J., & Metelski, D. (2021). Quantifying critical success factors (Csfs) in management of investment-construction projects: Insights from bayesian model averaging. Buildings, 11(8). https://doi.org/10.3390/buildings11080360 [24] Zainal, R., Al-Tawil, Y. M., Kasim, N., Meryam, S., Musa, S., Noh, H. M., & Mohammed, M. (2019). Success Factor for Project Management on High Rise Building Project. Journal of Technology Management and Business, 6(3), 50–059.
Son, J., Hong, T. H., & Lee, S. (2013). A mixed (continuous + discrete) time-cost trade-off model considering four different relationships with lag time. KSCE Journal of Civil Engineering, 17(2), 281–291. https://doi.org/10.1007/s12205-013-1506-3
Syafrimaini & Husin, A. E. (2021). Implementation of lean six sigma method in high-rise residential building projects. Civ. Eng. Archit, vol. 9, no. 4, pp. 1228–1236, doi: 10.13189/cea.2021.090424.
Tedla, T. O. (2019). Time-cost Trade-off Analysis for Highway Construction projects School of Science and Engineering in Construction Engineering by Under the supervision of Professor and Chair Department of Construction Engineering the American University in Cairo.
Tezel, A., Taggart, M., Koskela, L., Tzortzopoulos, P., Hanahoe, J., & Kelly, M. (2020). Lean construction and BIM in small and medium-sized enterprises (SMEs) in construction: A systematic literature review. Canadian Journal of Civil Engineering, 47(2), 186–201. https://doi.org/10.1139/cjce-2018-0408
Verma, J. P., & Verma, P. (2020). Determining Sample Size and Power in Research Studies. In Determining Sample Size and Power in Research Studies. https://doi.org/10.1007/978-981-15-5204-5
Wagner, J., & Watch, D. (2017). Innovation Spaces: The New Design of Work. The Anne T. and Robert M. Bass Initiative on Innovation and Placemaking, Brookings Institution, April, 64.
Wang, J., Yuan, H., Kang, X., & Lu, W. (2010). Critical success factors for the sorting of in-place break-in waste: A study in China. Resources. Preserve. Recycling., vol. 54, no. 11, pp. 931–936, doi: 10.1016/j.resconrec.2010.01.012.
Wang, S., Teng, Z., Xu, Y., Yuan, M., Zhong, Y., Liu, S., Wang, C., Wang, G., & Ohno, T. (2020). Defect as the essential factor in engineering carbon-nitride-based visible-light-driven Z-scheme photocatalyst. Applied Catalysis B: Environmental, 260, 118145. https://doi.org/10.1016/j.apcatb.2019.118145
Wong, K. K. K.-K. (2013). 28/05 - Partial least squares structural equation modeling (PLS-SEM) techniques using smart PLS. Mark. Bull, vol. 24, no. 1, pp. 1–32, [Online]. Available: http://marketing-bulletin.massey.ac.nz/v24/mb_v24_t1_wong.pdf%5Cnhttp://www.researchgate.net/profile/Ken_Wong10/publication/268449353_Partial_Least_Squares_Structural_Equation_Modeling_(PLS-SEM)_Techniques_Using_SmartPLS/links/54773b1b0cf293e2da25e3f3.pdf
Zainal, R., Al-Tawil, Y. M., Kasim, N., Meryam, S., Musa, S., Noh, H. M., & Mohammed, M. (2019). Success Factor for Project Management on High Rise Building Project. Journal of Technology Management and Business, 6(3), 50–059.
Zhang, J., Kang, L., Li, H., Ballesteros-Pérez, P., Skitmore, M., & Zuo, J. (2020). The impact of environmental regulations on urban green innovation efficiency: The case of Xi’an. Sustainable Cities and Society, 57(February), 102123. https://doi.org/10.1016/j.scs.2020.102123
DOI: https://doi.org/10.33258/birci.v5i3.6910
Article Metrics
Abstract view : 55 timesPDF - 72 times
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.