Evaluation Analysis of OCR and GFR Relay Protection Coordination on Feeder YB-02 PT PLN ULP Natal with ETAP Simulation

Zuraidah Tharo, Siti Anisah, Fariz Aditya Putra, Melly Andriana

Abstract


With the increasing number of customers of PT. PLN (Persero) ULP Natal, disruption to the distribution system will result in more widespread blackouts. To avoid this, the protection system in the distribution channel (especially in the YB-02 feeder) needs to be evaluated to ensure proper coordination. The protection systems are outgoing PMT, Recloser L-01 and Recloser L-02. The method used in this study is a method of observation, literature study, interviews and guidance. From this study, it was found that the coordination conditions between PMT Outgoing, Recloser L-01 and Recloser L-02 were correct and their capabilities could be improved by calculating the OCR and GFR relay settings. The coordination between PMT Outgoing.


Keywords


distribution protection; coordination and protection settings; OCR; GFR; recloser; PMT

Full Text:

PDF

References


Baand National Standardization. 2000. General Requirements for Electrical Installation 2000 (PUIL 2000). Jakarta: PUIL Foundation.

Lightat, Purwo Prasetyo. 2014. Calculation of Losses and Voltage Drops Due to Changes in Radial Network Configuration WL1.05 and WLI. Using Etap 7.0.0 Software. Diponegoro. University Electrical Engineering.

Gonen, T. 1986. Electric Power Distribution System Engineering. McGraw Hill: New York.

Handoyo, A. 2005. Analysis of Engineering Loss Calculation at PLN (Persero). UPJ Central Semarang.

Herianti, et.al. (2020). The Effectiveness Implementation of Package Payment System (INA-CBGs) at Inpatient Installation of RSUD Zainoel Abidin Banda Aceh. Budapest International Research and Critics Institute-Journal (BIRCI-Journal) Vol 3 (2): 1775-1781.

Saputra, A. (2018). Allocation of Education Budget in Indonesia. Budapest International Research and Critics Institute-Journal (BIRCI-Journal) Vol I (2): 142-148.

Sari, Hedy Febriana Puspita. 2016. Analysis of Technical Loss Value of Medium Voltage Network at Feeder 5 Matur PT PLN Rayon Koto. Electrical Engineering Padang.

Institute of Technology SPLN 1. 1995. Voltage–Standard Voltage. Jakarta: PT PLN (Persero).

SPLN 56-2. 1994. Medium Voltage Electrical Connection (SUTM). Jakarta: PT PLN (Persero).

SPLN 64. 1985. Guidance for Choice and Use of Fulfillers in Systems Medium Voltage Distribution.Jacard: PT PLN (Persero).

SPLN 72. 1987. Design Specifications for Medium Voltage Networks (JTM) and Jlow- voltage network (JTR). Jacard: PT PLN (Persero).

Suhadi, et al. 2008. Electrical Power Distribution Engineering. Jakarta: Department Penational education.

Suswanto, Daman. 2009. Electric Power Distribution System. field.

Tanjung, A. 2015. Analysis of 20 kV Distribution System to Improve Distribution System Performance Using Electrical Transient Analysis Program. Electrical Engineering at Lancang Kuning University.




DOI: https://doi.org/10.33258/birci.v4i3.2386

Article Metrics

Abstract view : 83 times
PDF - 94 times

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

 

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.